Skip to content

Showcase ​

This page stays conservative: one sample you can feel in 30 seconds, then the evidence rules. The before/after below is a fixture built from the weekly brief contract and public product capabilities (weekly modes, first-run local trial, capture receipt). It is not a private vault export and not a customer success claim.

Before / After ​

Before: plain git / hand-written weekly ​

text
This week:
- updated the weekly skill
- refreshed README and docs site
- adjusted cold-start copy
- tweaked capture receipts
- ran tests

Continue optimizing next week.

Reads like an activity list. It does not say what state changed, what remains gated, or which claims are actually supported.

After: Tracework weekly brief (fixture) ​

markdown
# 2026-W30 Weekly Brief

**Dates:** 2026-07-20 ~ 2026-07-22
**Scope:** work

## Weekly judgment

At the start of the week the product still looked like a system manual, and an
unconfigured first run could return empty under default work scope. This week
the positioning became “evidence-backed progress reports,” with weekly mode
split, local first-run trial, and capture receipts that point forward to
reports. Docs and skill contracts are aligned; host-session smoke and the
public sample gate remain open.

## Result arcs

### Public line and try-first path aligned

- **Starting constraint:** New users saw the full system; cold-start felt like a ticket
- **Decisive move:** Lead with “evidence-backed progress reports”; quick-start tries weekly first
- **End state:** README, docs site, and plugin copy share one line; reports can be tried after install
- **Why it matters:** Moves value to the first success instead of setup ceremony
- **Remaining gate:** Marketplace rendering after publish still needs a check
- **Evidence boundary:** recorded (docs/plugin manifests changed); marketplace UI not verified in this fixture

### Weekly split into quick / brief / slides

- **Starting constraint:** Ordinary weekly reports carried PPT diagram and narrative gates
- **Decisive move:** Three-mode routing; heavy rules only for slides
- **End state:** “What did we do this week” is a conversation quick view; default brief; PPT only when explicit
- **Why it matters:** Daily closure stays light; presentation depth remains available
- **Remaining gate:** Mode choice is contract-driven; no automated router assertion yet
- **Evidence boundary:** recorded (skill + skills pages synced)

### Unconfigured projects can try as local without leaking into work

- **Starting constraint:** Default work excluded unassigned repos, so first tries often looked empty
- **Decisive move:** Distinguish explicit / configured / implicit; implicit unassigned uses local
- **End state:** No vault still returns conversation output; explicit work still excludes unassigned with repair hints
- **Why it matters:** Try first, configure later, without breaking audience safety
- **Remaining gate:** One real no-config host smoke is still due
- **Evidence boundary:** recorded (skill + narrative contract); runtime smoke not claimed as verified

## Portfolio

| Stream | Status | What changed | Relation | Watch |
|--------|--------|--------------|----------|-------|
| Capture receipt forward line | done | Wrap-up now points at weekly/daily candidates | supporting | none |
| Quick-start / workflow docs | done | Match try-first narrative | supporting | none |
| Version bump | done | Plugin manifests at 0.6.0 | supporting | publish to marketplaces separately |

## Next-week closure targets

1. **Showcase gate:** public samples must be fixtures or desensitized real runs
2. **Host smoke:** no-vault weekly and quick review once each
3. **Release sync:** bump versions only when shipping a user-visible release

## Evidence boundary (summary)

- skill/contract edits: recorded
- git-only maintenance: limited, not promoted to outcomes
- unrun host install smoke: left as open gates, not invented as verified

How to read the After ​

Read pointMeaning
Stronger than BeforeHas a weekly judgment, state-change arcs, and next gates—not a commit dump
recordedLocally recorded decision/change; not independently proven in production
limitedThin or git-only signal; no invented motive or verified impact
Recorded rationalee.g. why brief skips logic diagrams; why unassigned cannot enter work
What was not inventedMissing host smoke and marketplace checks stay as gates, not completed claims

In 30 seconds: Before answers “what kept us busy”; After answers “what changed, how strong the evidence is, and what blocks next.”

Output Shapes ​

SurfaceWhat it should showProof boundary
CaptureRouted depth, goal, decision, rejected path, risk, evidence, next step; vault receipt points at later reportsA capture record is not independent proof
Weeklyquick / brief / slides; brief by defaultHeavy PPT rules only in slides; git-only stays limited
MonthlyRaw-first phase narrative, recurring risks, next-month targetsCounts stay in coverage, not outcomes

Example Claim Chain ​

text
O1 outcome or progress
  W1 supporting work stream
    D1 decision or tradeoff
      E1 raw entry or evidence reference

The chain is report-local. It helps readers move from a brief back to evidence, but it does not mutate raw data.

Real-Output Gate ​

Before adding another public case here, confirm:

  • the source is a real Tracework run or a clearly labeled fixture
  • private paths and proprietary details are removed
  • source_entry_refs are described as provenance, not automatic verification
  • every outcome claim has either independent evidence or a visible limitation
  • a core mechanism slide covers its main path, key branch or fallback, output, and invariant without treating diagram structure as effect evidence
  • routine maintenance stays in portfolio coverage without receiving a decorative architecture diagram
  • unsupported report claims carry an explicit evidence gap

Commands ​

CommandUse
/tracework:captureCapture the session; vault mode includes a forward-looking receipt
/tracework:dailyDaily closure; works without a vault
/tracework:weeklyBrief by default; quick review on “what did we do this week”; slides only for explicit PPT
/tracework:monthlyMonthly review
/tracework:cold-start-interviewConfigure vault, project identity, and reporting group

Last updated:

Released under the MIT License.